EETS INC

Industrial

EETS’s industrial power engineers are skilled in offering clients cost-effective and innovative design solutions to ensure safe and reliable electrical service. Whether collaborating with a client’s in-house engineering staff or serving as the primary electrical team, our engineers are dedicated to delivering the highest degree of service while minimizing operational risk.

SPOTLIGHT

Industrial Projects

Sacramento, California

Campbell Soup Company

Following the shutdown of the Rancho Seco Nuclear Plant, SMUD approached Campbell Soup to discuss replacement generation. The proposed project, a highly efficient natural gas-fired combined cycle power plant, would supply steam to the Campbell Soup Company manufacturing facility and 158 MW of electricity to SMUD. Over a span of more than twenty
years, EETS and Campbell Soup collaborated on this project and others:
Following the shutdown of the Rancho Seco Nuclear Plant, SMUD approached Campbell Soup to discuss replacement generation. The proposed project, a highly efficient natural gas-fired combined cycle power plant, would supply steam to the Campbell Soup Company manufacturing facility and 158 MW of electricity to SMUD. Over a span of more than twenty years, EETS and Campbell Soup collaborated on this project and others:

Roseville, California

NEC Corporation

EETS was requested to serve as the City of Roseville’s inspector on record for the installation of new facilities when the 700,000 square foot campus was being constructed. Additionally, our engineers were asked to provide engineering design and training services:

Rancho Cordova, California

Sprint Data Center & Communication Hub

EETS has been a preferred service provider to Sprint for emergency generator and switchgear controls for over ten years:

Fairfield, California

AIRCO Products (The BOC Group)

The BOC Group/AIRCO Products hired EETS to upgrade their Fairfield industrial gases plant.
Design of new 21kV primary service and distribution facilities:

Pittsburg & Willows, California

Johns-Manville Corporation

EETS provided electrical engineering design work for both the Pittsburg and Willows industrial plants for Johns-Manville. This involved:

San Juan Water District (SJWD)

San Juan Water District (SJWD) Emergency Generator Replacements

Replace three aging and undersized diesel-powered generators at three separate District pump stations through field investigation and by creating a preliminary design report with design options for the District to review.
The final design featured 300kW, 400kW, and 600kW generators equipped with 50% rated resistive load banks and automatic load bank switching controllers. Additionally, the design
Replace three aging and undersized diesel-powered generators at three separate District pump stations through field investigation and by creating a preliminary design report with design options for the District to review.
The final design featured 300kW, 400kW, and 600kW generators equipped with 50% rated resistive load banks and automatic load bank switching controllers. Additionally, the design included the replacement of two existing Automatic Transfer Switch (ATS) systems and an upgrade of the 480V power system. This upgrade encompassed the replacement and relocation of 480V switchboard and Motor Control Center (MCC) enclosures, circuit breakers, and bus bars in space-constrained pump houses.
included the replacement of two existing Automatic Transfer Switch (ATS) systems and an upgrade of the 480V power system. This upgrade encompassed the replacement and relocation of 480V switchboard and Motor Control Center (MCC) enclosures, circuit breakers, and bus bars in space-constrained pump houses.